Construction Update:
Construction of the Old Bath Road Water Main Extension has begun. Temporary work zone signage and mobile traffic signals were deployed on July 2nd and trenching has begun. Alternating one-way traffic is being utilized. The temporary traffic signals will be used from Monday morning to Friday afternoon. On the weekends, the construction equipment will be removed from the road and the signals will go to flashing yellow. The closure will be about 1,000 ft long and move along with the crew as they install nearly 11,000 ft of new water main. Contractors will ensure access to all properties during the project, though there may be temporary delays during work. For information on connecting to the new water main, please contact the Brunswick-Topsham Water District at (207) 729-9956.
The Town of Brunswick, in partnership with Cumberland County and the Brunswick-Topsham Water District, is seeking to install a water main extension along Old Bath Road and Bay Bridge Road in Brunswick
For the past several years the Town has been working on a project to extend the public water line for approximately 2 miles on Old Bath Road to the Bay Bridge Estates Mobile Home Park, addressing longstanding water supply issues for its residents. The mobile home park is currently served by wells that have been inadequate, as evidenced by the need to truck in water during the winter of 2017-2018. Residents have also reported concerns over water quality.
The Town has been working with Legacy Communities, the owner of Bay Bridge Estates, to negotiate an agreement for Legacy to connect the water system in Bay Bridge Estates to the public water supply at their cost.
The scope of work for this project includes installing 10,200 feet of a 12” water main along Old Bath Road and 600 feet of 8” water main along Bay Bridge Road, a 6” service stub to Bay Bridge Estates, along with associated hydrants, valves, and fittings.
One year following completion of the water main installation, the selected contractor will reclaim and repave Old Bath Road and provide an overlay of Bay Bridge Road. Water main installation and trench repair are to be completed by October 31, 2025. The reclaim and repave of Old Bath Road and overlay of Bay Bridge Road are to be completed by October 31, 2026.
The project is critical for ensuring access to a reliable, clean water supply for over 1,300 residents, while also improving fire protection along the route. Additional details are available below.