Planning Studies

Brunswick Pedestrian Safety Action Plan - Final Version 1

Heads Up Study

Pedestrian Safety Initiative forum to explore potential mitigation strategies to improve pedestrian safety and reduce crashes:
Pages from BTS_FinalPlan_20210506

Transit Study

Study exploring an opportunity to adjust Brunswick's Explorer service to better meet the needs of the growing Midcoast region:
Pages from 1. 2020 Bike Ped Plan Update Public Hearing Changes_8.8.2021_links

Bicycle and Pedestrian Study

Bicycle and Pedestrian Plan to serve as a guide for public transportation decisions that affect pedestrians and bicyclists in Brunswick: 
Pages from Riverwalk Draft Report 5-1-2021

Riverwalk Study

Study exploring the feasibility to widen and connect the river walk from the Frank J Wood Bridge to the Swinging Bridge: 
Pleasant Street Final Report

Pleasant Street Study

Study to analyze potential improvement strategies to improve congestion and safety along the Pleasant Street corridor for all modes of transportation: 
Pages from Pool Table - MaineDOT Brunswick 9-12-19 meeting Finalrev1
BunganucCulvert

Pool Table Study

Preliminary evaluation of transportation improvement alternatives on or adjacent to the Maine Street bridge over Route 1



Bunganuc Culvert Study

Final preliminary evaluation of remediation and replacement options for the structurally deficient culvert crossing under Bunganuc Road near Highland Road.

JordanAveProject

Jordan Avenue Improvement Project

The Town has spent the last several years on an improvement project along Jordan Avenue which will feature the complete reconstruction of Jordan Avenue from Lori Dr to Bath Rd, the installation of a new multimodal path measuring 8 to 10 ft wide, and the replacement of a failing culvert with a modern resilient design. Below is a link to the 95% complete construction plans as presented to the community and town council.

95% Construction Plans